HUB (University College Brussels)

HUB (University College Brussels)
HUB (University College Brussels)
HUB (University College Brussels)
HUB (University College Brussels)
HUB (University College Brussels)

 
Installing audiovisual equipment in 105 classrooms.

An overview of the materials used in function of the size of the room and the application:

• NEC projectors
• Extron MLC 62 RS control units
• Extron MLC 52 RS control units
• Extron MLC 104 IP Control Units
• Extron MMX 32 VGA A matrix switcher
• Separate SDQ5P active speaker sets
• Sennheiser microphones
• Sennheiser in ear monitoring
• Audac COM12 + WX502 speaker
• Crestron TPS-6X Wireless Touch Panel
• Crestron MPS-200
• Projecta Elpro Electrol Projection Screen
• Samsung LCDs 460MX-3

This installation was also realized at:
Stora Enso